February
25, 1924 to March 8, 1924
February 25,
1924 takeing from under Keystone Dredge for the second
time
New end walkway
on Steele Barge 316 - February 25, 1924
Steamer Voyager
March 4, 1924 broke Pitman strap repaired
finished at 6 PM
Cyclone
Digger March 4, 1924 repairs to - M. Deck - Engine timbers -
Journal bearings - new jockey stick on the Boom
March 1,
1924 new spud ready for Cyclone Digger 14 x 14 x 40
Hickory
Keystone Dredge
#4 off the Ways and away via Steamer Victory 2.25 PM Saturday March 8,
1924 General repairs - scraping and
painting they did this work with their own men Dravo
Co
This
is on Page 176 and 177
Steamer
Creighton Docked (?) finished Friday (?) new Hull except some
straight bottom new deck beams and deck new II
beams new Head new guards new coal
box cabin and B deck (?) repaired new
Knees new nosing iron new
wheel this was a big job
most of the floores and inside strakes were new
they were well pleased with this Job and she looked fine. Ed
Cambell Supt. for Glass Co. - Tom Hudson Bill Lightbody
Engineer William Lynch Jr. Foreman and liner.
This was not
the new Hull Job but a big repair Job about
16,000 the new Job was done later the new Hull
Job was finished January 14, 1925 Inspected January 15,
1925 Steamer Cruiser furnished steam. she coaled
at Cyclone Digger and away at 10.30 AM January 16, 1925