November 27, 1923 to December 11, 1923


 

Marine Ways derrick Boat #22 pulled to the top yard November 27, 1923

Hoisted new Smoke Stack on Ways Boiler house    Mitch Cooper done the Hoisting    Deck repaired on Hoist and off the Ways November 29, 1923

Sand Digger Steamer Rebecca of the Rodgers Sand Company Docked    in the top yard November 30, 1923

Steamer Ranger Docked December 1, 1923    repairs to   new pintal bars and washers - rudder irons - sheet iron - butts calked - chain tightened - Wheel - pipe work - chimneys shortened    Finished December 8, 1923

December 3, 1923   Steamer Voyager   repairs to coal box stanchion and wheel

Barges and Flats Docked & repaired December 1923   
Barge 34 - 26 - 83 - 30 - 18 - 74

Steamer Beacon in with coal for Ways   Loaded on bulldozer December 7, 1923

Steamer Beacon   December 10, 1923    new coal hatch covers    ladder up from roof to top of P house    repairs to F nigger    Bell lines    blower lines    Inspected December 11, 1923

Steam(er) Beacon December 11, 1923   ordered by Inspectors   change steam gauge - wheel on Master valve - pipe work over Boilers - fair leader at end of steam drum - shoe under tiller track stanchion