Steamboat Building in Elizabeth, PA

A Journal of daily activities at the Elizabeth Marine Ways 1898 to 1925 

February 1, 1923

Home ] Up ] 1923 ] January 2, 1923 ] January 10, 1923 ] [ February 1, 1923 ] February 16, 1923 ] March 1, 1923 ] March 21, 1923 ] April 4, 1923 ] April 23,1923 ] May 1923 ] July 1923 ] August 1923 ] September 1, 1923 ] September 12, 1923 ] November 1, 1923 ] November 27,1923 ] December 1923 ]

 

 

This journal page has been typed.  To view the actual journal entry click on the image below.

 

January 29, 1923 to February 15, 1923


 

Pump boat #80 Docked January 29, 1923    General Repairs

February 5, 1923    repairs to Steamer J.C. Risher    Bad wheel - tail line ring - sheeting in Coal Box - Machinery repairs - several lights of glass - cabin door locks - cleaned Boilers Sunday 4th - finished 7:30 AM  February 6, 1923

Steamer Voyager  February 7, 1923   repairs to - Boilers - ? ( bsitchen / or britchen / or britchese / or  a reference  to the breeching, which was the sheet metal work that connected the boilers to the smokestacks) - Pipe work - cam rods - Pantry door and Pastery table - out February 7, 1923   

Steamer Ranger  February 9, 1923   Repairs to Injector - Nigger - Pipe Work - cuting clearance for S pipes

February 8, 1923   unloaded coal for the Ways out of Flat 1055 - 650 bushels

February 9, 1923   unloading channel irons out of R.R. Car 5709  N. KP.

Barges and flats D and repaired   B 91 - sunk B 67 - F 1177 - B 83 - 29 - F 1096 - B 85 - F 1137 - 1142 - 1094 - 1089

18 ft. Yawl for Cincanatti Mine   February 12, 1923

February 15, 1923 Cold Day 8o above

January 29, 1923 to February 15, 1923

Click on image to view full page.

Back Home Up Next